241 These are the oak boards that I bought for the front. Here I am just laying them out for size. Date: 03/10/2010 These are the oak boards that I bought for the front. Here I am just laying them out for size.
243 These are the front boards cut to size and layed out in order. Date: 10/26/2007 These are the front boards cut to size and layed out in order.
244 This is an example of how I joined the boards. These are called biscuit joints. Here I cut the biscuit slots and checked for size. Date: 10/26/2007 This is an example of how I joined the boards. These are called biscuit joints. Here I cut the biscuit slots and checked for size.
258 The front has been assembled and glued. I leave the clamps on over night to allow the glue to dry. I used a special waterproof wood glue. Date: 10/26/2007 The front has been assembled and glued. I leave the clamps on over night to allow the glue to dry. I used a special waterproof wood glue.
261 This is how I cut some of the larger parts that were too big for my table saw. I used a straight edge and my circular saw. Date: 10/27/2007 This is how I cut some of the larger parts that were too big for my table saw. I used a straight edge and my circular saw.
264 This is how I joined the back and sides Date: 10/26/2007 This is how I joined the back and sides
266 Back to side example. Date: 10/26/2007 Back to side example.
267 I cut the grooves in the side and back to accept the lower shelf using my router. Date: 10/26/2007 I cut the grooves in the side and back to accept the lower shelf using my router.
268 Groove example again. Date: 10/26/2007 Groove example again.
PICT0502 The sides and back being glued together. Date/Time: Fri 21 Sep 2007 08:31:45 PM IST The sides and back being glued together.
PICT0504 Rear view of sides and back being glued together. Date/Time: Fri 21 Sep 2007 08:33:10 PM IST Rear view of sides and back being glued together.
PICT0507 Lower shelf installed. Date/Time: Fri 21 Sep 2007 10:20:29 PM IST Lower shelf installed.
PICT0521 Front assembly. Date/Time: Fri 05 Oct 2007 03:44:24 PM IST Front assembly.
PICT0524 This is a view of the bottom. I put a brace in the middle. The lower shelf could be used for a sump if needed. Date/Time: Sun 07 Oct 2007 04:43:52 PM IST This is a view of the bottom. I put a brace in the middle. The lower shelf could be used for a sump if needed.
PICT0527 Top is screwed and glued. Date/Time: Sun 07 Oct 2007 08:26:06 PM IST Top is screwed and glued.
PICT0528 Top glued. Date/Time: Sun 07 Oct 2007 08:26:34 PM IST Top glued.
PICT0537 The trim nailed is nailed on. The sanding has been done. I purchased the doors pre-made (it was cheaper than what I could do). This is a pic prior to staining and varnishing. Date/Time: Thu 11 Oct 2007 08:54:37 PM IST The trim nailed is nailed on. The sanding has been done. I purchased the doors pre-made (it was cheaper than what I could do). This is a pic prior to staining and varnishing.
PICT0546 Finished! Here I am just trying the aquarium for size. Date/Time: Thu 25 Oct 2007 11:59:46 AM IST Finished! Here I am just trying the aquarium for size.
PICT0547 Another view. Date/Time: Thu 25 Oct 2007 12:00:38 PM IST Another view.
PICT0548 View with an open door. Date/Time: Thu 25 Oct 2007 12:01:08 PM IST View with an open door.
PICT0550 Close up view of the knobs (fish knobs). Date/Time: Thu 25 Oct 2007 12:02:09 PM IST Close up view of the knobs (fish knobs).
PICT0551 I stained and varnished the inside too!! Date/Time: Thu 25 Oct 2007 12:02:46 PM IST I stained and varnished the inside too!!
PICT0564 The aquarium is set up and running. I added my comets and some Shubunkins to the tank. Date/Time: Wed 31 Oct 2007 09:56:51 PM IST The aquarium is set up and running. I added my comets and some Shubunkins to the tank.
PICT0565 Another view. Date/Time: Wed 31 Oct 2007 09:57:49 PM IST Another view.
389 Sponge filter project Date: 03/10/2010 Sponge filter project
390 Cutting sponge Date: 06/21/2007 Cutting sponge
394 Soaking sponges Date: 06/21/2007 Soaking sponges
396 Freezing sponge Date: 06/21/2007 Freezing sponge
417 Drilling a hole in the frozen sponge Date: 06/21/2007 Drilling a hole in the frozen sponge
419 Finished hole Date: 06/21/2007 Finished hole
420 Marking lift tube Date: 06/21/2007 Marking lift tube
421 Lift tube removed and drilled Date: 06/21/2007 Lift tube removed and drilled
422 Completed filter Date: 06/21/2007 Completed filter
PICT0369 Filter removing waste Date/Time: Tue 19 Jun 2007 10:24:18 AM IST Filter removing waste
426 Filter in aquarium Date: 06/21/2007 Filter in aquarium
[-]
Stop   Pause   Back One Image   Show More Info   delay:   direction:   max size: